A-1 is a Greensboro company. Our landfill is at 2091 Bishop Rd., off I-85, I-40 and I-74, so debris from a Greensboro demolition job has a short haul, and one company is responsible from the tear-down to final disposal.
In summer 2025 our crews took down the 60,000-square-foot Brooks Global Studies school building in Greensboro for Guilford County Schools. That job covered asbestos removal, an 8,000-gallon tank removal, demolition of the building and boiler room, basement backfill, grading and seeding.
We take down houses as well as commercial buildings. Recent residential jobs include homes in Pleasant Garden, just south of Greensboro, and across Randolph County. We handle the tear-down, haul everything away in our own trucks, and can take the lot from clearing to final grade.
We hold North Carolina General Contractor License #71646, and we handle asbestos inspection, removal and disposal with our own crews.
In Greensboro, a demolition permit comes from the city's Development Services office in the Engineering and Inspections Department. For a commercial building, the city wants a copy of the asbestos notice filed with the state, and the state wants that notice at least 10 working days before demolition starts, even when there's no asbestos. Filing that notice is part of our asbestos work. For a house, the city asks whether asbestos is present and wants a report from a state-accredited inspector. If the property is a landmark or in a historic district, the owner may need a Certificate of Appropriateness first, so tell us early.
Demolition is only part of the job. Our crews clear trees and brush, put up silt fence and safety fencing, remove old parking lots and tanks, and grade and backfill so the site is ready for what comes next.

We do the abatement with our own crews and take the material to our own landfill, so there is no handoff between separate contractors. Our crews work with our equipment: 14 negative air machines, electric ride-on floor tile scrapers for flooring removal, and excavators with hammers, shears and munchers for the tear-down.



The general contractor brought us in to take down the old 16,000-square-foot Rural Hall fire station. Our crews removed the asbestos first, then demolished the building, hauled the debris to our facilities and graded the lot. One contractor for the whole job.
See more projects →All done by our crews: tree clearing, erosion control, temporary jobsite fencing, friable and non-friable asbestos removal, an 8,000-gallon tank removal, demolition of the 60,000-square-foot building and boiler room, basement backfill, and rough grading and seeding. Metal and concrete were recycled, and everything else went to our landfill in Greensboro.
Doing it all ourselves saved the project owner an estimated $100,000 or more compared with the other bids. We also found a local hybrid academy to take the desks, chairs and school equipment left behind.
See all our projects →We deliver dumpsters and portable toilets across the Triad. Dumpster rental in Greensboro, dumpster rental in Winston-Salem, dumpster rental in High Point and dumpster rental in Burlington. Porta potty rental in Greensboro, porta potty rental in Winston-Salem, porta potty rental in High Point and porta potty rental in Burlington.
Tell us what you need and where. A real person on our team will call you back the same business day.